StackerMistress
What's a team lift?
- Joined
- Jan 12, 2013
- Messages
- 277
So either I'm getting slower (which I doubt is the case), or the estimated pull times given by Workload Planning Tools has become a lot more accurate. I used to be able to pull 1:20 in an hour if I hustled. Now a 45 minute pull actually takes close to 45 minutes. Have the algorithms changed? There are some instances where it still really overestimates... for example, if there are lots of different DVDs/Blurays to grab, I can get 20 minutes of MM2 in 5 minutes. But on the whole, it seems to be a lot closer in accuracy. Anyone else seeing the same thing?