ClearanceMaster
Price Accuracy TM
- Joined
- May 31, 2013
- Messages
- 822
So recently when pulling up the workload, this popped up. It says not to utilize the 120 eaches formula to make a schedule because it doesn't include "fixed workload" (which is labels I guess) and we also push and remerchandise softlines racks to make new ones at our store)
I told my TL and she can't find anything on MyTime.. so is there a pricing TL that can say how they are scheduling now they don't want us to use the 120 each method. Or can you say how many hours you got and how many tickets. Right now we are just doing 100 eaches and then adding 10 hours to that. And it's hardly enough with wor load jumps and pushing. Not to mention "shopability" hit our store in a really bad way.
BTW if you can see the store number in the picture it's not mine. I purposely scrolled to a generic number. So don't worry about outing me 😉
I told my TL and she can't find anything on MyTime.. so is there a pricing TL that can say how they are scheduling now they don't want us to use the 120 each method. Or can you say how many hours you got and how many tickets. Right now we are just doing 100 eaches and then adding 10 hours to that. And it's hardly enough with wor load jumps and pushing. Not to mention "shopability" hit our store in a really bad way.
BTW if you can see the store number in the picture it's not mine. I purposely scrolled to a generic number. So don't worry about outing me 😉