- Joined
- Oct 11, 2020
- Messages
- 16
Does anybody know why the pick path for priority pulls will prefer one backroom location over another?
For example, lets say a certain pillow has a quantity of 2 at location 01A (openstock) and a quantity of 10 at location 01B (openstock) and the priority pull batch asks for a quantity of 2, why does it send the TM to 01B rather than 01A?
Numerically, the sequence should go to 01A first, correct? But it's sending us to 01B instead. Anyone know why this is?
For example, lets say a certain pillow has a quantity of 2 at location 01A (openstock) and a quantity of 10 at location 01B (openstock) and the priority pull batch asks for a quantity of 2, why does it send the TM to 01B rather than 01A?
Numerically, the sequence should go to 01A first, correct? But it's sending us to 01B instead. Anyone know why this is?