- Joined
- Jul 9, 2012
- Messages
- 148
Why is that an easy aisle that only move 2 items take 0.9 hours to do (100% True), while a HBA aisle full of dividers change almost EVERY shelf says take only 1.9 hours to do (Also 100% true)???
WHAT THE HELL IS THE CORPORATE PEOPLE SMOKING??!??
The easy aisle that move only 2 items (without ANY dividers whatsoever) shouldn't take more than 5 minutes to do, period.
Yet, this HBA aisle that almost every shelf will move is basically like doing it from scratch, since dividers are involved. I've to basically removed the products, remove the dividers, replace the dividers on the new spot, then repush the products.
Yes, people, if you never done HBA revs before, this is exactly how it works. A much more tedious process than any other aisles in the store. Dividers are the killer!
Only 1.9 hours? Are you people on crack, or just have NO clue at all about how these revisions/planograms are done? It's at least 3-4x as long!!!
Argh, this is what I've to deal with all the time....corporate issue revisions like this makes NO freaking sense, and they don't give me enough hours to deal with these crap, or think I am slow when I go over what it is, which is clearly incorrect. NO one can do pretty much a whole aisle in 1.9 hours, with all these dividers in the way. Either way, even if I do a good job, some people will not know what it takes, and will think I am being slow or not doing a good job *SIGH*
FIRE the person who designs these stupid planograms, assess the hours wrongfully cuz I am being killed here! I am tired of working so hard, yet the ridiculous assessed hours is screwing the perception of my work performance :/
WHAT THE HELL IS THE CORPORATE PEOPLE SMOKING??!??
The easy aisle that move only 2 items (without ANY dividers whatsoever) shouldn't take more than 5 minutes to do, period.
Yet, this HBA aisle that almost every shelf will move is basically like doing it from scratch, since dividers are involved. I've to basically removed the products, remove the dividers, replace the dividers on the new spot, then repush the products.
Yes, people, if you never done HBA revs before, this is exactly how it works. A much more tedious process than any other aisles in the store. Dividers are the killer!
Only 1.9 hours? Are you people on crack, or just have NO clue at all about how these revisions/planograms are done? It's at least 3-4x as long!!!
Argh, this is what I've to deal with all the time....corporate issue revisions like this makes NO freaking sense, and they don't give me enough hours to deal with these crap, or think I am slow when I go over what it is, which is clearly incorrect. NO one can do pretty much a whole aisle in 1.9 hours, with all these dividers in the way. Either way, even if I do a good job, some people will not know what it takes, and will think I am being slow or not doing a good job *SIGH*
FIRE the person who designs these stupid planograms, assess the hours wrongfully cuz I am being killed here! I am tired of working so hard, yet the ridiculous assessed hours is screwing the perception of my work performance :/
Last edited: