- Joined
- Sep 27, 2011
- Messages
- 65
Well I'm scheduled 8 shifts in 6 days of work 2 of those days are of course double shifts 5 shifts are truck shifts 3 are front end I can already tell due to the 5 truck shifts that ill be over 40 in no time due to us not having a full truck team & I've posted my cashier shifts to see if any1 wants them but my store front end work is like a death sentence
My curiousness has got me since the schedule is "posted" and I already know ill be over 40hrs in no time & took iit upon myself and gave up the cashier shifts to help my hours situation if no 1 takes those shifts & I'm flirting with the 40hrs would I have to
A. Still work those and be over 40?
B. Call out (tho ill feel bad to) and stay under 40
I've already looked for any1 that was available those days that could help me out and take those shifts but no luck I will be talking to the LOD for both days to see their opnion on it tho I'm thinking either way I might get in trouble due to hours or calling off any1 have any suggestions or helpful info for me
My curiousness has got me since the schedule is "posted" and I already know ill be over 40hrs in no time & took iit upon myself and gave up the cashier shifts to help my hours situation if no 1 takes those shifts & I'm flirting with the 40hrs would I have to
A. Still work those and be over 40?
B. Call out (tho ill feel bad to) and stay under 40
I've already looked for any1 that was available those days that could help me out and take those shifts but no luck I will be talking to the LOD for both days to see their opnion on it tho I'm thinking either way I might get in trouble due to hours or calling off any1 have any suggestions or helpful info for me