- Joined
- Jan 4, 2013
- Messages
- 11
Need in written the number of each es that aTM is expected to do each day. Ex says it's 1200 we are not doing that even when we mis breaks. Please help. I was told in training to expect closer to 800_900 a TM this could make the difference between a coaching or an apology for mis scheduling. I'm new and trying to solve the red score...the ex says it's the team, I need to be sure we set them up for success before wr coach then for failure.