- Joined
- Sep 23, 2018
- Messages
- 10
So I love doing GS. I asked my GSA why I was never getting GS shifts and they said it was because I wasn't GS "certified" in the POS system and made my "certified". Does that really tell the scheduling system to give me GS shifts or not? Do the two talk to each other?