Recently, my store has started to have flow team come in on two separate times to maintain a level of energy or in better terms, to bring fresh legs in during the reg. push/pull days. I originally was able to get 5+hrs./shift, but now I am only getting 3 hrs. Has anyone else had Logistics use this strategy and if so how did it go/how long did it last?