It would be a revision. It was for water bottles.Is it new or a revision? With revisions I put up the shelf strips, match the product, and drop an exf batch.
KitchenThere's probably 6-8 different sections in our store with water bottles. Which one is yours?
1. Infants
2. Sporting goods
3. Back to school
4. Kitchen
5. Seasonal in front of store
6. Endcap of kitchen
7. Another section in toys/sporting goods
The pog shows what fixtures and signing to use. Read it.How are you *actually* supposed to set a pog. How do I know what dividers/pegs to get? Do I take all the product down then push it back out?
The one I did today just showed I needed 6 shelves. Not the dividers or type of pegs or anythingThe pog shows what fixtures and signing to use. Read it.
Then it didn’t call for anything else other than shelves. Always check the line listing in the zebra to see if it’s different than the paper pog.The one I did today just showed I needed 6 shelves. Not the dividers or type of pegs or anything
The one I did today just showed I needed 6 shelves. Not the dividers or type of pegs or anything
Only problem I can possibly see with that if you wait too long to drop your batch it will drop on it's own as an oos or into the autofill
What do I do if there is a ton of product on the floor all mixed up with a ton salvage a ton goes in other areas and a ton is clearance and a ton goes back out in different locations?
Don’t tie the pog until the auto fill for that group has been pulled. If you do it before, it will mix with the auto fill.It does this anyway. I can tie the pog first thing and pull before I set. Boom, it drops half my pull into the autofill. So what do you do?
Don’t tie the pog until the auto fill for that group has been pulled. If you do it before, it will mix with the auto fill.