Pettjm54
Sales floor TL
- Joined
- Jun 8, 2011
- Messages
- 195
Team,
I am a scope b project store... Getting the focal installed Wednesday according to a message board. The message board indicates the ENTIRE gondola, BOTH SIDES. Need to be demerched. I hope this isn't true as one side is fancy feast and the other is Litter. As for the contractor, is this an overnight deal? During the day? 4am? (I am a 4am store)
I am a scope b project store... Getting the focal installed Wednesday according to a message board. The message board indicates the ENTIRE gondola, BOTH SIDES. Need to be demerched. I hope this isn't true as one side is fancy feast and the other is Litter. As for the contractor, is this an overnight deal? During the day? 4am? (I am a 4am store)