    Pricing and Presentation Overnight Old School

    Just given word that we will be foregoing transition and pricing as it relates to modernization. Instead creating 2 teams. One pog. One pricing. To go overnight for the next 4 months. I and another lead will likely be scheduled along with 6-8 other TMs for this process. IDNK if Pricing will...
  2. N

    Style SFQ

    Does anyone know if there is a way to change the SFQ on an entire pog/table at the same time rather than doing it individually? It would save us so much time!
  3. V

    New Seafood/Chicken Meat Revision

    The revision calls to remove all black mats because of cross contamination from packaging. Anyone know what fixture is in place now?
  4. B

    Pfresh Planograms

    Can anyone send me a picture or tell me how to see a planogram that is 5 weeks away. We are remodeling. Pfresh is switching the meat side and the produce side. I wanted to see the new planograms for both sides early to start preparing because that meat side is going to take forever because of...
  5. H

    ODL

    How long did it take for everybody to build all the patio displays?
  6. T

    Pricing and Presentation Presentation Team Lead

    Any tips on what I can do better as TL for presentation? Before presentation I was a TL for SFS during 4th quarter. I was comfortable with my role as had support from other TL's and my ETL. We did excellent as a store during 4th quarter (Keep in mind it wasn't just me as we had 3 SFS leads at...
  7. wheresmyzebra

    I'm Lost! Verifying tied POGs

    Hey Team, Does anyone know of a way to look up what POGs are tied to which endcaps/aisle sections? Thanks!
  8. V

    Pricing and Presentation No more transition experts?

    Heard this week from my SD and District director that we are to get rid of transition experts and have them own an area. Dbo should set most of it earlier than the set date or as it flows in. Anybody else get that info? Not a fan of doing it like this, no easy way to plan that.
  9. wheresmyzebra

    I'm Lost! POG Tying and Aisle Endcap Sections

    Hey Team, I need some guidance, perhaps a link to a post (I searched and didn't find anything recent). I have a good understanding of aisle sections, shelf, shelf spot (Ex: G30(0) 1-1-1 and G17(1) 3-3-4) but my question is end caps. I've have had it explained differently to me at different...
  10. T

    Does Transitions Set on Time matter anymore?

    My store doesn't care about TWT at all. We probably only tie 70% - 80% of workload every week and never go back to finish the workload. Is this normal?
  11. T

    Planogram training

    Hey everyone, as I mentioned before on here, I started at a target rather recently and while I’ve made some mistakes, I think in general, I’ve done okay in the areas I’ve been assigned. I’m nearly certain that will change tomorrow as I’m doing planogram training for the first time. Now, my...
  12. P

    MyTasks

    Who’s involved with this? It’s not user friendly and now I’m required to use it to pre-tie all my pogs. I can barely read it (and the pre-tie process forces me to re-enter and drill down to my workload every time I do one). Corporate needs to stop enforcing the MUST use policy on poorly...
  13. Sushi2Go

    10/6 small appliance transition

    How's everyone transition so far for those who've started? Like how we gonna move all these aisles around and only schedule 2 people 😩
  14. P

    Pricing and Presentation Adjacency Calendar

    Well, the adjacency calendar has been replaced. Forget the name of the new tool, but it sucks. While it tries to divide the workload for the areas, it still hides things. And not having an option to show everything (uh, hr uses the AC to schedule btw) makes it easy to miss somethings. I...
  15. P

    Pricing and Presentation Halloween

    So, aside from the asinine approach to BTC/BTS clearance… this transition set may have been our smoothest yet. Three early AM shifts with 5 setters and we’re 90% finished. Push is handled by a secondary crew. We were short some fixtures though, so we’ve called some remodeling stores to see if we...
  16. B

    Archived Style POGs

    Y’all. I’m so confused. I think I was trained wrong about the POGs inside VMGs so I just need to get everything straight. 1. How do you know which product flow map to use? Just whichever one is closest to your store? (Direction of shopping lady and other fixtures) 2. If product was pushed to...
  17. C

    Archived How are you actually supposed to set a POG?

    How are you *actually* supposed to set a pog. How do I know what dividers/pegs to get? Do I take all the product down then push it back out?
  18. P

    Archived Breaking ties

    It's become apparent that some pogs (especially at the end of their set life) can not be untied through MyWork. Does anyone know how to break these ties?
  19. U

    Archived CRAZY capacities

    We have one peghook in seasonal that has a capacity of 1800. Really Target. Really? Why is there so much inefficiency concerning this. I can understand a few off. But when you have locations that say they'll hold 278 when it can.pnly hold 6, something is wrong. Instead of expecting every...